Application Ref: 2024-101366 Church: Glastonbury: St Benedict
Diocese: Bath & Wells Archdeaconry: Wells
Status: Public notice Logged By:
Summary: Replacing of the existing underfloor heating and timber floor in the aisles and nave, with a solid construction, new underfloor heating and a stone flag finish.

Below, please find a list of all publicly available documents.

Access to these documents will cease once the application has been determined by the Diocesan Chancellor.

Application details

Standard Information
Application Formal Consultation Responses
Notification of Advice
Petition
Public Notice

Supporting documents

File NameFile UploadedDescription
0875 ltr DAC J Carreira-White 29.07.2024.pdf 29/07/2024 15:20:03Architects' Covering Letter
0875 Specification 2024.pdf 29/07/2024 15:22:35Specification and Schedule of Works
0875 Floor Repair Meeting Notes 09.11.2023.pdf 29/07/2024 15:23:21Report on Existing System and Proposed Recommendations.
1929 BJP M&E Scope of Works_DAC Submission.pdf 29/07/2024 15:23:49Heating Outline Specification
Statement of Sig&Need - Mar'12.pdf 29/07/2024 15:24:24Statements of Need and Significance
0875.S.003 Existing Ground Floor Finishes Floor Plan 2024-A1_rev -.pdf 29/07/2024 15:24:53Existing Ground Floor Finishes Floor Plan
0875.S.004 Existing Underlying Ground Floor Finishes Plan-A1_rev -.pdf 29/07/2024 15:25:19Existing Underlying Ground Floor Finishes Plan
0875.S.005 Existing Ground Floor Finishes Sections and details-A1_rev -.pdf 29/07/2024 15:25:44Existing Ground Floor Finishes Sections and Details
0875.P.006 Proposed Ground Floor Finishes Floor Plan-A1_rev -.pdf 29/07/2024 15:26:10Proposed Ground Floor Finishes Plan
0875.P.007 Proposed Ground Floor Finishes Sections and details-A1_rev -.pdf 29/07/2024 15:26:29Proposed Ground Floor Finishes Sections and Details
0875.P.008 Proposed Font Surround-A1_rev -.pdf 29/07/2024 15:27:32Proposed Font Surround
0875.P.009 Proposed Heating Plan-A1_rev -.pdf 29/07/2024 15:27:47Proposed Heating Plan
0875.P.010 Contractor Site Plan-A3_rev -.pdf 29/07/2024 15:28:10Proposed Contractors Site Plan
0875 ltr DAC J Carreira-White 07.11.2024.pdf 07/11/2024 14:47:07Architects' letter clarifying committee question regarding pews.
Glastobnury email from church architect in response to pre-consultation advice.docx 21/01/2025 11:41:46Glastonbury email from church architect in response to pre-consultation advice
W_HERef_E00239908_466045_2024-101366 HE Response_St Benedict_Glastonbury.pdf 27/02/2025 17:19:21Historic England Response
St Benedicts Church Benedict Street Glastonbury faculty 2024-101366 our ref 202676 SPAB response 7 march 2025.docx 10/03/2025 17:17:17St Benedicts Church Benedict Street Glastonbury faculty 2024-101366 our ref 202676 SPAB response 7 march 2025
Glastonbury Vic Soc Response 4.3.25.docx 11/03/2025 16:58:47Vic Soc No comments response 4.3.25
CBC response 10 February 2025.docx 12/03/2025 12:43:02CBC response 10 February 2025 content to leave for consideration to DAC