|
Initial consultation.presentation May 21.pdf
| 30/05/2022 11:17:28 | Options Appraisal
Presented to and approved by PCC |
|
May 20 INTIAL DRAWINGS stage 1 options.pdf
| 30/05/2022 11:19:21 | Initial proposal options presented to sub group May2020 |
|
27.05.21 (2) St Andrew's PCC.docx
| 30/05/2022 11:22:07 | PCC minutes of special meeting to discuss and approve proposals and to seek DAC advice |
|
Final Draft Statement of Needs Dec2021.docx
| 30/05/2022 11:24:28 | Final draft of statement of needs (photos incorporated) |
|
Final Draft Statement of Significance Dec2021.docx
| 30/05/2022 11:25:09 | Final draft of statement of significance (photos incorporated) |
|
_HERef_PA01197763_L418568.doc
| 28/11/2022 15:07:30 | 22-1122 Historic England |
|
St Andrew's Church Cheddar - Energy Audit.pdf
| 04/01/2023 10:19:30 | Energy Opportunity Survey by Green Journey |
|
St Andrews Heating Report.pdf
| 04/01/2023 10:20:19 | BJP - HEATING OPTIONS APPRAISAL REPORT - APRIL 2022 |
|
St Andrew, Cheddar NADFAS survey woodwork benches section.pdf
| 23/01/2023 18:14:19 | Extract from St Andrew's NADFAS survey of the church - woodwork benches section, detailing the history of the pews |
|
22-1213 Historic Buildings and Places.pdf
| 27/02/2023 12:23:32 | 22-1213 Historic Buildings and Places |
|
12-1214 CBC.pdf
| 27/02/2023 12:25:36 | 12-1214 CBC. |
|
23-0109 SPAB.pdf
| 27/02/2023 12:26:31 | 23-0109 SPAB |
|
23-0127 Victorian Society.pdf
| 27/02/2023 12:29:59 | 23-0127 Victorian Society. |
|
_HERef_PA01197763_L425653.doc
| 23/03/2023 14:05:26 | 23-0322 Historic England |
|
CHEDDAR Delegation Visit Report 26 January 2023(16744707.1).docx
| 01/06/2023 13:48:14 | CHEDDAR Delegation Visit Report 26 January 2023 |
|
StAndrews_Design Narrative_issue2.pdf
| 26/03/2024 11:39:02 | Architects Design Narrative |
|
Specifications.zip
| 26/03/2024 11:39:51 | Specifications |
|
Services.zip
| 26/03/2024 11:42:19 | Services |
|
Appendix 1 DAC delegation report.docx
| 26/03/2024 11:49:47 | Appendix 1 to statements |
|
Appendix 2 ESDP Heating report Aug 2023.pdf
| 26/03/2024 11:50:22 | Appendix 2 to statements. heating report |
|
Nadfass. p96.pdf
| 26/03/2024 11:52:28 | Appendix 3 to statements. Nadfass pews 1 |
|
Nadfass. p97.pdf
| 26/03/2024 11:52:48 | Appendix 3 to statements. Nadfass pews 2 |
|
Nadfass. p98.pdf
| 26/03/2024 11:53:08 | Appendix 3 to statements. Nadfass pews 3 |
|
Nadfass. p99.pdf
| 26/03/2024 11:53:28 | Appendix 3 to statements. Nadfass pews 4 |
|
Appendix 4 Pew Survey drawing.pdf
| 26/03/2024 11:54:18 | Appendix 4 to statements. Pew survey drawing |
|
Appendix 5 St Andrew's Project Brief Sept 2014 revised.doc
| 26/03/2024 11:54:46 | Appendix 5 Architects brief |
|
Appendix 6 Summary of questionnaire results.docx
| 26/03/2024 11:55:28 | Appendix 6 to statements. Summary of questionnaire |
|
March 2024 Statement of Needs .docx
| 26/03/2024 11:56:38 | March 2024 Revised statement of Needs |
|
March 2024 Statement of Significance .docx
| 26/03/2024 11:57:11 | March 2024 Revised statement of Significance |
|
A308_13.03._FACULTY APPLICATION1.pdf
| 26/03/2024 14:07:11 | Drawings file 1 |
|
A308_13.03._FACULTY APPLICATION2.pdf
| 26/03/2024 14:07:40 | Drawings file 2 |
|
A308_13.03._FACULTY APPLICATION3.pdf
| 26/03/2024 14:08:10 | Drawings file 3 |
|
A308_13.03._FACULTY APPLICATION4.pdf
| 26/03/2024 14:08:38 | Drawings file 4 |
|
A308_13.03._FACULTY APPLICATION5.pdf
| 26/03/2024 14:10:06 | Drawings file 5 |
|
St Andrews Church Cheddar. response to DAC meeting of May 24.docx
| 27/06/2024 11:16:21 | St Andrews Church Cheddar. response to DAC meeting of May 24 |
|
Cheddar St Andrews 1 July 2024 Architect and heating consultant response .docx
| 03/07/2024 16:09:50 | Cheddar St Andrews 1 July 2024 Architect and heating consultant response |
|
Arch response to DAC queries June 24.docx
| 03/07/2024 16:10:15 | Architect response to DAC queries June 24 |
|
P. 23 A-PROPOSED FLOOR PLAN revision june 24.pdf
| 03/07/2024 16:10:38 | P. 23 A-PROPOSED FLOOR PLAN revision June 24 |
|
Church of St Andrew Cheddar, Impact Assessment-1.pdf
| 12/07/2024 10:40:47 | Church of St Andrew Cheddar, Impact Assessment-1 |
|
A308_13.03._Pews_24.09.20.pdf
| 23/09/2024 10:50:10 | Proposed pew restructuring |
|
Cheddar St Andrew HE advice.docx
| 24/01/2025 15:45:30 | Cheddar St Andrew HE advice |
|
Cheddar St Andrew Church Building Council.docx
| 24/01/2025 15:48:12 | Cheddar St Andrew Church Building Council. |
|
Cheddar St Andrew Response from SPAB.docx
| 24/01/2025 15:50:01 | Cheddar St Andrew Response from the SPAB. |
|
Cheddar St Andrew HBAP response.docx
| 24/01/2025 15:52:53 | Cheddar St Andrew HBAP response |
|
Cheddar St Andrew response from the Victorian Society.docx
| 24/01/2025 15:54:18 | Cheddar St Andrew response from the Victorian Society. |
|
Additional information in response to DAC comments of Feb 2025.zip
| 09/04/2025 10:23:55 | Additional drawings and visualisations in response to DAC comments of Feb2025 |
|
St Andrews Church Cheddar. Response to Feb 2025 DAC mtg.docx
| 10/04/2025 16:44:36 | written response to points raised at Feb DAC meeting |
|
Response to DAC Aug 2025.docx
| 09/08/2025 10:32:41 | Written response to points raised at May 2025 DAC meeting |
|
P.31-2-STAGE PLANS.pdf
| 09/08/2025 10:34:41 | Revisions to stage layout |
|
P. 23-PROPOSED FLOOR PLAN.pdf
| 09/08/2025 10:35:19 | Revisions proposed floor plan |
|
Addendum to statements of significance and needs; Response to DAC Aug 2025.docx
| 02/09/2025 16:29:43 | Revised Statement of significance and Need - Response to DAC Accessibility queries Aug 2025 |
|
St Andrews Church Cheddar. Response to DAC meeting of 24thSeptember 2025.docx
| 26/10/2025 11:48:43 | Addendum to statement of significance and needs. Response to DAC meeting of 24th September 2025 |
|
Y_HERef_E00240684_482022_HE response.pdf
| 08/12/2025 15:20:40 | Historic England's response |
|
FW_ Request for Formal Consultation under Part 4_5 of the Faculty Jurisdiction Rules 2019 - Cheddar_ St Andrew (601005) ref 2022.msg
| 11/12/2025 13:06:11 | HBAP - Response Defer to DAC 10.12.2025 |
|
Layouts, sections plans.zip
| 15/01/2026 10:29:24 | Layouts, sections, plans. Final for approval |
|
Pews.zip
| 15/01/2026 10:30:11 | Pews. Final for approval |
|
Services.zip
| 15/01/2026 10:30:48 | Services. Final for approval |
|
Specifications.zip
| 15/01/2026 10:33:02 | Specifications. Final for approval |
|
Statement of Needs.Final for approval Jan 2026.docx
| 15/01/2026 15:56:54 | Statement of needs. Final for Approval |
|
Statement of Significance. Final for approval. Jan 2026.docx
| 15/01/2026 15:57:28 | Statement of Significance. Final for Approval |