1398_002-EXISTING SITE PLAN.pdf
| 01/08/2025 14:43:11 | Existing Site Plan |
|
1398_003-EXISTING GROUND & FIRST FLOOR PLAN.pdf
| 01/08/2025 14:48:01 | Existing Ground & First Floor |
|
1398_004-EXISTING ROOF PLAN.pdf
| 01/08/2025 14:48:11 | Existing Roof Plan |
|
1398_006-EXISTING WEST ELEVATION.pdf
| 01/08/2025 14:48:31 | Existing West Elevation |
|
1398_005-EXISTING NORTH ELEVATION.pdf
| 01/08/2025 14:48:39 | Existing North Elevation |
|
1398_007-EXISTING SOUTH ELEVATION.pdf
| 01/08/2025 14:48:47 | Existing South Elevation |
|
1398_008-EXISTING EAST ELEVATION.pdf
| 01/08/2025 14:49:02 | Existing East Elevation |
|
1398_010-EXISTING SECTION A-A.pdf
| 01/08/2025 14:50:22 | Existing Section A-A |
|
1398_020-PROPOSED SITE PLAN.pdf
| 01/08/2025 14:50:33 | Proposed Site Plan |
|
1398_024-PROPOSED WEST ELEVATION.pdf
| 01/08/2025 14:51:12 | Proposed West Elevation |
|
1398_026-PROPOSED EAST ELEVATION.pdf
| 01/08/2025 14:52:24 | Proposed East Elevation |
|
1398_031-Proposed Heating - HALO .pdf
| 01/08/2025 14:52:55 | Proposed Heating - Halo
|
|
1398_032-Proposed Heating - UNDER PEW.pdf
| 01/08/2025 14:53:06 | Proposed Heating - Under Pew
|
|
Bat Survey Report Final v3_St Dubricius July2025.pdf
| 01/08/2025 14:53:56 | Ecology Emergence Survey
|
|
25.05.02 Report Triptych.pdf
| 01/08/2025 15:00:21 | Triptych Report |
|
St. Dubricius Church - Condition survey of the painted timber reredos.pdf
| 01/08/2025 15:00:33 | St. Dubricius Church - Condition survey of the painted timber reredos |
|
2025_04_23_Letter Report - Nave.pdf
| 04/08/2025 17:13:09 | Structural Report - Nave |
|
17274 St Dubricius Church Calc Pack.pdf
| 04/08/2025 17:13:20 | Structural Report - Calc Pack |
|
2025_02_19 PCA Spire Report Amended.pdf
| 04/08/2025 17:13:44 | Structural Report - Spire |
|
1398_001-LOCATION PLAN.pdf
| 05/08/2025 15:04:56 | Location Plan |
|
St Dupricious,Porlock_Quote-SH140225-AH3.pdf
| 05/08/2025 15:38:25 | Infrared Heating Quote |
|
Proposal St Dubricius Church.pdf
| 05/08/2025 15:38:42 | PV Proposal |
|
Spire Condition Report May 2023.pdf
| 05/08/2025 15:45:53 | Spire Condition Report |
|
1398_009-EXISTING SECTION DETAILS - ROOFS.pdf
| 05/08/2025 15:56:34 | Existing Roof Section Details |
|
1398_034-PROPOSED SECTION DETAILS - SPIRE ROOF.pdf
| 05/08/2025 15:56:48 | Proposed section detail - spire roof |
|
Fundraising strategy Aug 25 update.pdf
| 06/08/2025 09:05:19 | Fundraising Strategy |
|
1398_033A-Proposed PV .pdf
| 14/08/2025 12:02:02 | 1398_033A-Proposed PV updated 14.8.25 |
|
1398_025A-PROPOSED SOUTH ELEVATION.pdf
| 14/08/2025 12:02:42 | 1398_025A-PROPOSED SOUTH ELEVATION updated 14.8.25 |
|
1398_022A-PROPOSED ROOF PLAN.pdf
| 14/08/2025 12:03:00 | 1398_022A-PROPOSED ROOF PLAN updated 14.8.25 |
|
St Dubricius - HE Response - Rev 01.pdf
| 14/08/2025 12:09:57 | Response to HE concerns 14.8.25 |
|
SPAB response to PV panels and Glazed porch doors.pdf
| 15/08/2025 11:00:50 | 25.7.2025 SPAB response to PV panels and Glazed porch doors |
|
Vic Soc response 20.8.2025.pdf
| 20/08/2025 16:57:46 | Vic Soc response -No Comment 20.8.2025. |
|
Porlock_ St Dubricius (Bath & Wells)_ altarpiece.msg
| 03/09/2025 14:15:14 | CBC comments relating to the conservation of the altarpiece only 1.9.25 |
|
HPAB response 15.9.25 - some concerns.pdf
| 18/09/2025 10:02:13 | HPAB response 15.9.25 - some concerns |
|
1398_021A-PROPOSED GROUND & FIRST FLOOR PLAN.pdf
| 19/09/2025 11:14:38 | PROPOSED GROUND & FIRST FLOOR PLAN -updated 19.9.25 |
|
1398_023A-PROPOSED NORTH ELEVATION.pdf
| 19/09/2025 11:21:42 | PROPOSED NORTH ELEVATION -updated 19.9.25 |
|
St Dubricius Statement of Significance.pdf
| 19/09/2025 11:27:38 | Statement of significance updated 19.09.25 |
|
St Dubricius Statement of Need.pdf
| 19/09/2025 11:32:25 | Statement of need updated 19.09.25 |
|
1398_027A-PROPOSED SECTION A-A.pdf
| 19/09/2025 11:37:35 | PROPOSED SECTION A-A updated 19.9.25 |
|
250915.1398.SoW Faculty-A.pdf
| 19/09/2025 11:40:06 | 250915.1398.SoW Faculty-Aupdated 19.9.25 |
|
Design Access and Heritage Statement Faculty.250915-REV01.pdf
| 19/09/2025 11:42:07 | Design Access and Heritage Statement Faculty.250915-REV01. Updated 19.09.25 |
|
Petitioners note confirming plan on upgrade of electricity supply 19.9.25.pdf
| 19/09/2025 13:52:42 | Petitioners note confirming plan on upgrade of electricity supply |
|
SPAB response 26.9.25.pdf
| 01/10/2025 09:37:39 | SPAB response 26.9.25 |
|
Methodology for Access and Maintenance of Proposed PV Panels.docx
| 27/10/2025 11:36:39 | Methodology for Access and Maintenance of Proposed PV Panels |
|
Response to DAC Comments 251027.pdf
| 27/10/2025 11:36:52 | Response to DAC Comments 251027 |
|
Porlock St Dubricius The SPAB comments .pdf
| 31/10/2025 14:43:50 | The SPAB comments dated 30 October 2025 |
|
CBC advice 1 and 2.pdf
| 04/11/2025 19:40:52 | CBC advice 1 and 2 |
|
74847Approved Conditions_1541.pdf
| 07/11/2025 10:54:30 | Planning approval with conditions |
|
_HERef_PA01204152_L478687.doc
| 11/11/2025 19:51:49 | HE comments 9.10.2025 |
|
HE Advice Letter re Faculty application 2025-117742, St Dubricius Church, Porlock, Nov 25.pdf
| 21/11/2025 15:29:16 | HE 19/11/2025 Further Comments received to formal consultation |
|
Confimation and image for location of PVP Battery and Inverter 5.12.2025.pdf
| 05/12/2025 12:16:30 | Confimation and image for location of PVP Battery and Inverter 5.12.2025 |
|
CBC response 8.12.2025 defer to DAC.pdf
| 08/12/2025 11:00:15 | CBC response 8.12.2025 defer to DAC |
|
SPAB response 15.12.2025 with queries for Parish.pdf
| 16/12/2025 14:25:41 | SPAB response 15.12.2025 with queries for Parish |
|
Architect email response to SPAB Halo locations are confirmed as per drawing 16.12.2025.pdf
| 16/12/2025 15:34:32 | response to SPAB Halo locations are confirmed as per drawing |