571 - Archaeological Written Scheme of Investigation.pdf
| 28/05/2025 11:22:06 | Archaeological written scheme of investigation |
|
571 - DAC Engineer's Report.pdf
| 28/05/2025 11:23:23 | DAC Engineer's Report |
|
571 - Design Option Matrix.pdf
| 28/05/2025 11:24:36 | Design option matrix used to refine chosen scheme. |
|
571 - Full Permission.pdf
| 28/05/2025 11:24:59 | Granted full planning permission |
|
571 - Proposed Drawings - Faculty Applciation.pdf
| 28/05/2025 11:25:24 | All proposed drawings from Church Architect |
|
571 - Statement of Mission.pdf
| 28/05/2025 11:25:37 | Statement of Mission |
|
571 - Statement of Need.pdf
| 28/05/2025 11:25:48 | Statement of Need |
|
571 - Statement of Significance.pdf
| 28/05/2025 11:26:02 | Statement of Significance |
|
571 - PCC Minutes 11.05.2023.pdf
| 28/05/2025 11:31:52 | PCC resolution to make Faculty application - minutes of meeting |
|
571 - Forms 1A, 3A, 4A (historic).pdf
| 28/05/2025 11:39:25 | Forms submitted for previous application. |
|
Judgment(19279855.1).pdf
| 26/06/2025 15:00:03 | Chancellor's Judgment to create a doorway in the North wall of the
mediaeval tower |
|
Wellow proposed ground floor extension to the N of tower to provide wcs and kitchenette.docx
| 19/08/2025 12:16:37 | The SPAB advice 25.7.25 'no further comments' |
|
571JH 11-9-25 revised answer to DAC response of 6-8-25.docx
| 29/09/2025 12:58:43 | 571JH 11-9-25 revised answer to DAC response of 6-8-25 |
|
571 - Schedule of Materials (Condition 8).pdf
| 29/09/2025 12:59:00 | 571 - Schedule of Materials (Condition 8).pdf |
|
571-L-15-Tower Door Details (Condition 12).pdf
| 29/09/2025 12:59:12 | 571-L-15-Tower Door Details (Condition 12) |
|
571-L-16A-Proposed Electrical Layout (Condition 4).pdf
| 29/09/2025 12:59:25 | 571-L-16A-Proposed Electrical Layout (Condition 4). |
|
571-L-16-Proposed Electrical Layout (Condition 4).pdf
| 29/09/2025 12:59:45 | 571-L-16-Proposed Electrical Layout (Condition 4) |
|
571-L-17.1-Proposed Detail Elevations North (Condition 6).pdf
| 29/09/2025 13:00:05 | 571-L-17.1-Proposed Detail Elevations North (Condition 6) |
|
571-L-17.2-Proposed Detail Elevations West (Condition 6).pdf
| 29/09/2025 13:00:25 | 571-L-17.2-Proposed Detail Elevations West (Condition 6). |
|
571-L-18.1-Proposed Joinery Details (Condition 11).pdf
| 29/09/2025 13:00:41 | 571-L-18.1-Proposed Joinery Details (Condition 11) |
|
571-L-18.2-Proposed Joinery Details (Condition 11).pdf
| 29/09/2025 13:00:58 | 571-L-18.2-Proposed Joinery Details (Condition 11) |
|
571-Planning Conditions.pdf
| 29/09/2025 13:01:18 | 571-Planning Conditions. |
|
3727-DW-01B.pdf
| 29/09/2025 13:01:35 | 3727-DW-01B |
|
3727-DW-02B.pdf
| 29/09/2025 13:01:47 | 3727-DW-02B |
|
571 2025.05.13 FACULTY RESPONSE response 16-9-25.pdf
| 29/09/2025 13:02:08 | 571 2025.05.13 FACULTY RESPONSE response 16-9-25 |
|
Wellow Vic Soc Oct 2025.pdf
| 06/11/2025 13:50:49 | 'No comment' response from the Victorian Society dated 28 October 2025 |
|
Y_HERef_E00240634_481034_2025-115022.doc.docx
| 21/11/2025 15:26:22 | HE 19/11/2025 No further comment to earlier comments. |
|
HBAP response Wellow 2025 115022.docx
| 27/11/2025 10:37:56 | Response from HPAB 25 Nov 2025 to defer
|
|
wellow the Georgian Group.docx
| 09/12/2025 20:40:38 | The Georgian Group comment 'content to defer' 5.12.25 |
|
571-L-14-Proposed North Wall Sectional Elevation.pdf
| 24/12/2025 09:38:36 | tower north elevation and how the tower doorway works will be reinstated. 23.12.2025 |